Skip to main content

Every time I change the Open scheduler to customers on one of my events, it changes this on my other events? Why are my events connected?

How to Separate Your Event Settings

To ensure that changes made to one event - such as the "Open scheduler to customers" date - do not affect your other events, follow these steps to disable propagation:

  1. Navigate to the Events / Preview page.

  2. Click the Event Settings button.

  3. Locate the Propagator Mode section.

  4. Find the setting labeled Propagate Changes to:.

  5. Change the selection from All events of this type to Only current event.

What is Propagator Mode?

  • All events of this type: When this is selected, the system assumes you want a "global" configuration. Any change to a date, message, or setting on one event is instantly "pushed" to every other event of that same type.

  • Only current event: This "unlinks" the events. It allows you to have different opening dates, different email notifications, and different rules for every individual event you create.

Pro-Tip If you have a group of events that should stay connected (for example, three different "Summer Camp" sessions) but one event that needs to be different (like "Staff Training"), keep the propagator on while you set up the camps, then switch it to Only current event before you begin configuring the specific details for the staff event.